The diagram shows a force of $12\,\text{N}$ applied to push a box up a slope. The box travels $8.0\,\text{m}$ along the slope, and its vertical rise is $2.5\,\text{m}$. How much work is done in pushing the box from the bottom to the top of the slope?
- A$1.5\,\text{J}$
- B$4.8\,\text{J}$
- C$30\,\text{J}$
- D$96\,\text{J}$