The diagram illustrates the short-run cost curves of a firm. Which of the following statements is correct?
- ACurve 1 is the marginal cost curve.
- BCurve 2 is the average variable cost curve.
- CCurve 3 is the average fixed cost curve.
- DCurve 4 is the average total cost curve.