(a)[6]
Refer to Appendix A (reproduced from the insert). Calculate the following values for the network used to assemble a kit house:
- Overall duration of house assembly [2]
- Free float for activity H [2]
- Activity F total float [2]
(b)[12]
Evaluate the role that critical path analysis (CPA) has in meeting QH’s quality targets.