What could lead to overheads being under absorbed?
- AOverhead absorbed is greater than overhead budgeted.
- BOverhead absorbed is less than overhead budgeted.
- COverhead incurred is greater than overhead absorbed.
- DOverhead incurred is less than overhead absorbed.