What does the term stepped cost mean?
- AIt contains both fixed and variable elements.
- BIt is fixed for a given level of output then increases.
- CIt is fixed for any level of output.
- DIt is variable for a given level of output.
Accounting 9706 · AS & A Level · Costs and cost behaviour
What does the term stepped cost mean?